the belt around the bottom of the foot pulley and forward to the top of the head pulley. Next, drop line down near side of casing. Hitch line 3 or 4 feet from the end of the elevator belt, leaving the end free to make the final connection at the inspection door. Before making the final connection, be sure that the takeup is set properly.